MERI market guide
Remote Control Mowers for Guam and the Northern Mariana Islands
Tropical growth, storm recovery and island delivery
Plan for dense verge growth and uneven access after heavy rain. Identify the exact island and unloading location early in the quotation.
- ISO 9001
- Exported to 100+ countries
- Reply within 24 hours

Plan around the actual work site
Storm-season recovery
Walk the route after storms and remove loose debris before mowing resumed growth.
Airport and facility service areas
Confirm access permissions, exclusion zones and hours. Survey turn space between fixtures before specifying the machine.
Roadside and estate drainage
Identify soft shoulders, steep cut edges and waterlogged channels before choosing where to operate.
Shortlist by machine and access

Use the site observations above to decide where each machine fits.
- ME800-24 has an 800 mm cutting width and a published 950 mm overall width. Check actual gate clearance and the headland separately.
- ME1000-48 is a gasoline model with a 1000 mm cutting width and a published 1150 mm overall width. Ask MERI to confirm the applicable EPA documents for the selected engine family. Check trailer payload and the room needed to turn.
Check both working and transport dimensions in the model data sheets.
Import and delivery checklist
| Topic | What to check | What to expect |
|---|---|---|
| Destination and clearance | Guam and the Northern Mariana Islands have import arrangements distinct from the mainland United States customs regime. Use the local clearing agent for the specific island and give the exact destination and consignee. | Model data sheet, shipment dimensions and commercial documents for the order. |
| Shipping documents | Tell us the consignee, destination and language when requesting your quote. | English shipping documents are standard. The commercial invoice and packing list can also be prepared in French, Spanish, Portuguese or Russian on request. |
| Delivery and payment | Confirm the handover location, unloading arrangement and requested schedule. | Review the delivery and payment terms in the written quotation. |
Related markets
Frequently asked questions
Can the same freight instruction be used for Guam and Saipan?
Specify the actual destination for each order and confirm the clearance, local handling and unloading arrangements with its agent.
Which measurements help MERI shortlist a machine?
Send the narrowest gate, working slope in each direction, vegetation type and a photo of the turning area.
Which shipping documents can MERI prepare?
English shipping documents are standard. The commercial invoice and packing list can also be prepared in French, Spanish, Portuguese or Russian on request.
How do I confirm delivery and payment terms?
Send the final job location and named port or handover point. Confirm the terms and timing in your written quotation.
Where do I find specifications for the selected model?
Use the current technical data sheet for your exact model. Compare the width and mass of fitted equipment before planning transport.
Tell us about your work site
Specify the actual destination for each order and confirm the clearance, local handling and unloading arrangements with its agent.