From fabrication to container loading
Inside the MERI Factory
Follow six stages of mower production and export preparation in Shouguang, Shandong.
- ISO 9001:2015
- 20 years of experience
- Exported to 100+ countries
- Reply within 24 hours
- 20 years of experience
- Exports to 100+ countries
- ISO 9001:2015
- Shouguang, Shandong
Six stages from frame to shipment
1. Welding
A robotic welding cell handles frame and deck work. The video shows the cell in operation at MERI.
2. Coating
Steel parts receive a protective finish. Ask about standard colours or give us your RAL colour with the order.
3. Assembly
The assembly team fits the engine, drive system, tracks and controller for the configuration on your order.
4. Remote-control testing
Before packing, the team checks machine start-up and control response. Ask for the check record for your machine if you need it for an inspection.
5. Packing
Machines are wrapped and secured in steel frames or wooden crates. Agree on packaging and unloading requirements before shipment.
6. Container loading
The team secures the load inside the container. Ask for loading photos and the packing list for your order.
Robotic welding at MERI
Pre-delivery inspection checklist
Each machine is checked before packing. The 13 items below follow the factory checklist. Configuration-specific checks apply where fitted.
- Bolts, fasteners, guards and overall assembly
- Engine oil, fuel circuit and cooling system
- Battery, drive motors, wiring and controller
- Engine start, idle and throttle response
- Remote-controller start and communication
- Forward, reverse, left and right steering
- Zero-radius / pivot-turn function
- Cutting deck / flail rotor engagement
- Cutting deck raise and lower function
- Emergency-stop function
- Signal-loss / fail-safe protection
- Slope, block or test-obstacle travel
- Track grip, tension, alignment and clearance
We also check for oil leaks and verify the final appearance and accompanying documents.
Blank pre-delivery checklist
The factory uses this English form to record pass, fail and corrective action before approving a machine for packing.

Product inspection certificate
Each machine ships with a signed MERI product inspection certificate. This is the blank English sample.

See what goes into your order
Confirm the build
Use the order sheet to verify model, power system, cutting equipment and any requested finish before assembly.
See the pre-shipment checks
Ask to review the checks for your machine, how it will be packed and what you need to unload it.
Visit or book a video tour
Tell us which models and production steps you want to see. We can arrange a factory visit or a live video tour.
Browse the certificate register and the manufacturer overview.
Frequently asked questions
Where is the MERI factory?
In Shouguang, Weifang, Shandong Province, China. The factory’s ISO 9001:2015 certificate covers agricultural machinery processing, including mowers, rotary tillers and snow throwers.
Is every machine tested before shipping?
Yes. Each machine goes through our pre-delivery inspection before packing, including assembly, engine and electrical checks, travel and steering, cutting-system operation, emergency stop, signal-loss protection and track checks. We check cutting-deck lift where fitted, look for oil leaks and verify the final appearance and documents. A signed MERI product inspection certificate accompanies each machine.
Can I see the pre-shipment checks for my machine?
Ask for the check record or a demonstration for your machine before packing. Include any inspection items you need us to document.
Can I visit the factory?
Contact us to arrange a visit in Shouguang or ask for a live video tour. A week’s notice helps us schedule the visit.
How are MERI machines packed for export?
Steel frames and wooden crates are both available. We confirm the packaging with your configuration and delivery requirements. Ask for loading photos for your order.
How quickly do orders ship?
Orders of 1–10 machines usually ship about 7 days after payment is confirmed. Larger orders take about 7–15 days, depending on configuration and materials.
See your machine before it ships
Tell us your model and what you would like to check. We reply within 24 hours.
Certificates and compliance · OEM configurations · Case studies