Factory-direct equipment · Republic of Ireland
Buying a Commercial Remote Control Mower in Ireland
Buying for the Republic of Ireland? Use one checklist to compare the fitted machine, who handles the import and where the crate changes hands. Send an Eircode and the actual unloading entrance so freight quotes cover the same delivery point.
- CE Certified
- EPA Compliant
- ISO 9001
- Exported to 100+ countries
- Reply within 24 hours

Use the work schedule to choose the cutting head
Estate and contractor work
Send two site photos if the job includes both short turf around buildings and overgrown drainage edges. Mark which area is cut regularly and which needs a first clearance. Then measure the narrowest point from the unloading entrance to each area.
First clearance of rough margins
Compare a flail configuration such as the ME1000D-48 where a 1,000 mm head is appropriate. Ask for the overall fitted width and weight before planning a crossing, trailer or ramp. Mark soft edges and the point where the machine can turn on firm ground.
Repeat maintenance of estate turf
Use the T-Series shortlist for maintained turf. If the same crew also clears neglected margins, quote the two tasks separately first. That makes it easier to see whether one cutting setup will give the finish and clearance needed on both routes.
At a glance
Compare Irish quotes at the same handover point
Republic of Ireland procurement
Compare what to send with what to confirm before ordering.
| Decision point | Send with the enquiry | Confirm before ordering |
|---|---|---|
| Customs agent | Name the importing business and who will act for it on a shipment from outside the EU. | Who uses the EORI, who lodges the customs declaration and who receives the paperwork. |
| Machine documents | Give the exact model, engine and cutting head listed on the quote. | Which declaration of conformity, machine identification and operating instructions go with the supplied configuration. |
| Freight scope | Provide the Irish county, postal address and Eircode. State if you want port handover or site delivery. | The named handover point and which charges cover terminal handling, clearance and inland haulage. |
| Separate entrance | If delivery uses a service gate away from the postal address, send its map pin, vehicle access width and turning space. | Whether the carrier can reach that entrance, who unloads and what equipment the crate requires. |
For an import from outside the EU, confirm the EORI and declaration arrangements with your customs agent. Check the CE marking details and conformity documents for the machine you are ordering. If the quote ends at a port, ask separately for clearance, haulage and unloading costs before comparing it with a site-delivered quote.
Two details to check before accepting the quote
Worksite and delivery
Match the finish to the maintained turf

Match the paperwork to the machine

Get two comparable quotes from the same brief
Define the workSend one photo of the maintained area and one of the roughest growth, with access and slope measurements.
Match the paperwork to the buildAsk for a line listing the model, engine, head and spare parts so your importer can review the exact configuration.
Name the handover pointUse the same Eircode, entrance, unloading scope and freight endpoint on every quote you compare.
Questions
Frequently asked questions
Which model suits wet Irish slopes and banks?
Compare the ME800-48 and ME1000-48 for maintained slopes and banks. Check ground firmness after rain and measure the steepest grade and turning space.
Does the Republic of Ireland quote also cover Northern Ireland?
The routes and paperwork differ, so tell us your delivery location and we will quote the right option.
Are the mowers CE certified?
Yes. Engine emission and noise documents for your exact model are provided with the quote.
What if the access gate is away from the delivery address?
Tell us the gate location and width when you ask for a quote so the delivery and machine size fit your site.
Do you look for Irish dealers?
Yes. Dealers typically earn a 40–60% gross margin, the 46 most-used spare-part types ship within 48 hours, and we reply within 24 hours.
Keep reading
Related buying resources
Get a quote for your project in Ireland
Send your worksite photos, tightest access, county and Eircode. Tell us whether the quote should end at a port or cover delivery to your named entrance, and who will unload.