
Remote Snow Removal for Warehouses, Logistics Yards and Campuses
Trucks keep arriving at 5 a.m. whether it snowed or not. One operator with a remote tracked snow blower can open the docks, ramps and walkways before the first shift.
- CE Certified
- EPA Compliant
- ISO 9001
- Exported to 100+ countries
- Reply within 24 hours
Where a remote blower pays off first
For most facilities, a remote snow blower pays off on the areas people and forklifts use first: dock aprons, ramps, pedestrian routes and fire exits. Clear those in a fixed order, let the plow or contractor handle the big car park later, and you get the site working hours sooner with one person instead of a crew.
Why facilities struggle with snow
- Ramps and dock aprons freeze first and are the most dangerous places to walk.
- Contractors arrive after the storm, often after the first shift starts.
- Ride-on machines cannot get between parked trailers and building walls.
- Shovel crews are expensive, tired and exposed to the cold.
A clearing order that works
- Fire exits and emergency routes — always first.
- Dock aprons and truck ramps — the ME-RS throws snow 3–5 m clear, so the apron stays flat.
- Pedestrian walkways between buildings — 600 or 800 mm width fits between rails and walls.
- Staff entrances and smoking areas — short runs, high foot traffic.
- Open car park — plow (dual-end ME-RS rear blade, or plow on a mower) or your contractor.
What one machine covers
- Up to 0.6 ha/h — roughly 6,000 m² of routes per hour
- Snow up to 600 mm deep
- Stated remote range up to 800 m; choose a position with a clear view of the work area
- 5.5 L tank: plan a refuel break on long shifts
Shift routine
| When | What |
|---|---|
| Evening before forecast snow | Fuel, check auger and chute, charge remote |
| Start of snowfall | First pass on fire exits and ramps |
| Every few hours | Repeat priority zones so snow never compacts |
| After the storm | Car park with plow or contractor; pre-season kit check |
Facilities that use this clearing sequence
- Logistics and cold-storage yards
- Hospitals and care homes
- Universities and school campuses
- Business parks and industrial estates
FAQ
Can the ME-RS clear loading docks and yards?
Compare the 800 or 1000 mm blower width for yards and lanes. The rated throw is 3–5 m. Plan where the discharged snow can land away from traffic and people.
How much yard can one machine clear?
Up to 0.6 ha per hour, depending on snow depth and obstacles.
Can the operator stay out of truck traffic?
Set a work boundary away from moving trucks and choose an approved operating position with a clear view. The ME-RS rated remote range is up to 800 m.
How should we plan the clearing order?
Clear emergency routes and dock aprons first, then main lanes, then storage areas. Ask us for a layout suggestion with your quote.
How fast are spare parts and replies?
The 46 most-used spare-part types ship within 48 hours, and we reply within 24 hours.
Attachment fitting reference

Related
Send us your site plan
Mark docks, ramps and walkways. We suggest a clearing width and routine within 24 hours.