Remote Mowing Time Calculator: Hours, Days and Fleet Size

Enter your area and the time you have for each cut. The calculator uses MERI reference work rates and a site factor you choose, and shows hours, days and how many machines you need.

Reference rates: ME800 4,000 m²/h, ME1000 5,000 m²/h, ME1200 6,000 m²/h. Example: 20 ha with an ME1000 on a mixed site (80%) is 50 hours, about 8.3 six-hour days, so two machines finish within 5 days.

  • CE Certified
  • ISO 9001
  • Exported to 100+ countries
  • Reply within 24 hours
Remote control mower cutting a grassy embankment
Remote mower on an embankment
4,000 m²/hME800 reference
5,000 m²/hME1000 reference
6,000 m²/hME1200 reference
1 ha= 10,000 m²
1 acre= 4,047 m²

Calculator

Estimate mowing time and fleet size






Hours per cut–
Working days per cut (one machine)–
Machines to finish in time–

Estimate only. It uses the MERI reference rate times the site factor you choose. The site factor is a planning assumption, not a measured MERI figure. Measure your own rate on the first jobs.


Reference

Reference work rate by model group

Reference rates from MERI product pages. Day figures are calculated.
Model groupCutting widthReference ratePer 6 h day at 100%
ME800-24 / -48 / D-24 / D-48800 mm4,000 m²/h2.4 ha
ME1000-24 / -48 / D-24 / D-481000 mm5,000 m²/h3.0 ha
ME1200-24 / -48 / D-24 / D-481200 mm6,000 m²/h3.6 ha

Worked examples

Three example sites

Calculated with the tool above. Real output depends on growth, slope and the operator.
SiteInputsResult
Solar farm, 20 haME1200, 65%, 7 h/day, 10 days51.3 h, 7.3 days, 1 machine
Orchard, 50 acresME1000, 65%, 6 h/day, 5 days62.3 h, 10.4 days, 3 machines
Embankment, 8 haME800, 50%, 6 h/day, 3 days40 h, 6.7 days, 3 machines

What it means for you

Using the result

Add a margin

Allow for rain days, breakdowns and refuelling.

Check the factor

After a few jobs, replace the site factor with your measured rate.

Wider is not always faster

In tight rows, a narrower deck can finish sooner.

Talk to us

Send the area and photos for a site-specific estimate.

Tracked mower clearing an orchard row on a slope

Site factor

Why the site factor matters

Turns at row ends, slopes, tall growth and obstacles all slow a mower down. The site factor scales the reference rate to your ground. It is your estimate, so start low on difficult sites.

Questions

Frequently asked questions

How is the time calculated?

Area in m² divided by the reference rate times the site factor. Days = hours ÷ working hours per day.

Where do the work rates come from?

From MERI product pages: 4,000, 5,000 and 6,000 m²/h for ME800, ME1000 and ME1200.

Is the 48 V model faster than 24 V?

The reference rate is the same. 48 V gives more travel power on slopes.

Does the calculator cover T-Series or sprayers?

No. T-Series turf work has no fixed rate, and sprayers depend on tank and dose.

Can MERI check my estimate?

Yes. Send the area, slope, growth type and photos.

Keep reading

Related MERI resources

Want a site estimate?

Send the area, slope and photos. We reply within 24 hours.