Remote Mowing Time Calculator: Hours, Days and Fleet Size
Enter your area and the time you have for each cut. The calculator uses MERI reference work rates and a site factor you choose, and shows hours, days and how many machines you need.
Reference rates: ME800 4,000 m²/h, ME1000 5,000 m²/h, ME1200 6,000 m²/h. Example: 20 ha with an ME1000 on a mixed site (80%) is 50 hours, about 8.3 six-hour days, so two machines finish within 5 days.
- CE Certified
- ISO 9001
- Exported to 100+ countries
- Reply within 24 hours

Calculator
Estimate mowing time and fleet size
Estimate only. It uses the MERI reference rate times the site factor you choose. The site factor is a planning assumption, not a measured MERI figure. Measure your own rate on the first jobs.
Reference
Reference work rate by model group
| Model group | Cutting width | Reference rate | Per 6 h day at 100% |
|---|---|---|---|
| ME800-24 / -48 / D-24 / D-48 | 800 mm | 4,000 m²/h | 2.4 ha |
| ME1000-24 / -48 / D-24 / D-48 | 1000 mm | 5,000 m²/h | 3.0 ha |
| ME1200-24 / -48 / D-24 / D-48 | 1200 mm | 6,000 m²/h | 3.6 ha |
Worked examples
Three example sites
| Site | Inputs | Result |
|---|---|---|
| Solar farm, 20 ha | ME1200, 65%, 7 h/day, 10 days | 51.3 h, 7.3 days, 1 machine |
| Orchard, 50 acres | ME1000, 65%, 6 h/day, 5 days | 62.3 h, 10.4 days, 3 machines |
| Embankment, 8 ha | ME800, 50%, 6 h/day, 3 days | 40 h, 6.7 days, 3 machines |
What it means for you
Using the result
Add a margin
Allow for rain days, breakdowns and refuelling.
Check the factor
After a few jobs, replace the site factor with your measured rate.
Wider is not always faster
In tight rows, a narrower deck can finish sooner.
Talk to us
Send the area and photos for a site-specific estimate.

Site factor
Why the site factor matters
Turns at row ends, slopes, tall growth and obstacles all slow a mower down. The site factor scales the reference rate to your ground. It is your estimate, so start low on difficult sites.
Questions
Frequently asked questions
How is the time calculated?
Area in m² divided by the reference rate times the site factor. Days = hours ÷ working hours per day.
Where do the work rates come from?
From MERI product pages: 4,000, 5,000 and 6,000 m²/h for ME800, ME1000 and ME1200.
Is the 48 V model faster than 24 V?
The reference rate is the same. 48 V gives more travel power on slopes.
Does the calculator cover T-Series or sprayers?
No. T-Series turf work has no fixed rate, and sprayers depend on tank and dose.
Can MERI check my estimate?
Yes. Send the area, slope, growth type and photos.
Keep reading
Related MERI resources
Want a site estimate?
Send the area, slope and photos. We reply within 24 hours.