Short answer: When grass and reeds grow past the panel edge, treat the first cut as its own job. Walk the rows first and mark cables, stakes and debris. Use a flail mower and cut high on the first pass, then come back lower once the material has dried. Bring in a forestry mulcher only where there are woody stems. Then set a trigger height and a schedule so the site never gets this tall again.
A solar site can miss a season of mowing for many reasons: a contract changes hands, the wet season runs long, or the crew cannot keep up. By the time someone looks, grass and reeds stand over a metre high and reach into the panels. This guide is for O&M teams and contractors who need to bring a site like that back under control.
Why tall growth is a real problem
- Shading. Growth that reaches the lowest panel edge cuts output.
- Fire. Dry stems under the arrays are fuel.
- Hidden hazards. Tall growth hides cables, junction boxes and damage.
- Access. Inspection and cleaning crews cannot walk the rows.
Walk it before you cut it
Do not send a machine into growth you cannot see through. Walk each block, or at least a sample of rows, and mark:
- Exposed or loose cables and connectors.
- Fallen fixings, offcuts and other debris.
- Survey stakes, markers and low posts.
- Wet hollows, standing water and animal burrows.
Clear loose debris by hand before cutting. A flail or mulcher will throw it.
Video recorded at a solar site near Nanjing, China. The machine carries our dealer’s brand name.
Grass, reeds or wood? Pick the head
| What is growing | Suggested machine | Notes |
|---|---|---|
| Tall grass and reeds | ME1000D-48 flail mower | 30–300 mm cutting height; 920 mm machine height |
| Woody stems and brush | ME-RFM1000-D or ME-RFM1000-E mulcher | Light branches up to 30 cm on the data sheets |
| Kept grass afterwards | ME900-T or ME1000D-48 | ME900-T is 500 mm high for low panels |
Most overgrown sites are grass and reeds, not wood. A flail mower such as the ME1000D-48 is the main tool. If young trees and thorny brush have moved in, see our guide to forestry mulchers for solar site reclamation.
Cut in two passes
- First pass, high. Set the deck near the top of its range. This takes off the bulk without overloading the rotor or scalping hidden ground.
- Let it dry. Leave the cut material to dry and settle. It is lighter and easier to process.
- Second pass, at routine height. Bring the deck down to the height your contract sets. See vegetation height limits in O&M contracts.
- Clear the panel edges. Make sure no cut material is left leaning on modules or blocking drains.
Go slower than usual on the first pass. If the engine labours, slow the travel speed rather than lifting the head higher.

Wet ground and reeds
Reeds often mean wet ground. Tracks spread the weight, but they can still sink and rut. Work the dry sections first and leave wet hollows until the ground firms up. Never drive into standing water.
Wet grass also clogs a deck faster. Stop and clear it with the engine off and the rotor stopped. Our page on remote mowers for wet grass and soft ground covers set-up for these conditions.

- Back to a routine: set a trigger height well below the lowest panel edge and plan visits before the grass reaches it. Visits need to be closer together in the warm, wet months. See our solar farm mowing calendar.
- Estimating the job: the ME1000D-48 lists 5,000 m²/h on normal grass. On metre-high growth, expect much less, and allow for two passes. Time a test strip first. For routine mowing, use our solar mowing cost calculator.
What to send MERI
- Photos of the worst rows, with something for scale.
- Lowest panel edge height and row spacing.
- What is growing: grass, reeds, brush or young trees.
- Ground conditions, especially wet areas.
- Site area and the height limit in your contract.
Frequently asked questions
Can a remote mower cut grass taller than the machine?
Yes, with a flail deck and a staged approach. Walk the rows first, cut high on the first pass, then come back lower once the material has dried.
Do we need a forestry mulcher?
Only where there are woody stems or brush. Most overgrown solar sites are grass and reeds, which suit a flail mower.
How soon should the second pass follow?
Once the cut material has dried and settled. The exact gap depends on the weather.
How do we stop it happening again?
Set a trigger height below the lowest panel edge and plan visits before the grass reaches it, with closer visits in the growing season.
Get an overgrown site back under control
Send MERI photos of the worst rows, your panel height and ground conditions. We will suggest a machine and setup and send the TDS for your quote.
Need a mower recommendation for your terrain or project?
Get a Quote