Remote Control Mowers for Water Treatment Works and Reservoirs
Keep grass short for inspections on lagoon banks, filter-bed slopes and reservoir embankments. Choose a work route that gives the operator a clear view from firm ground.
- CE Certified
- EPA Compliant
- ISO 9001
- Exported to 100+ countries
- Reply within 24 hours

Water utility jobs
Steep, wet banks right next to open water
Mark the work boundary and keep the operator on firm ground.
Embankment inspection needs short, even grass
Plan cuts around inspection access so changes in the bank stay visible.
Controlled contractor access
Check contractor access, site training and escort requirements.
Soft ground around lagoons
Assess surface bearing and postpone work if the ground is unstable.
Model choice
Recommended configurations
| Area | Model |
|---|---|
| Lagoon and tank banks | ME800-48 |
| Reservoir embankments | ME1000-48 / ME1200D-48 |
| Tight areas around plant | ME650-T |
Field evidence
MERI field example

Work from a surveyed position
Keep the mower in view and follow the site’s setbacks around open water. Mark soft patches, drains and pipes before mowing. Match the cutting height and operating limits to the selected model.
Plan the first job
Mark the inspection area, access paths and exclusion zones.
Measure bank length, slope and the narrowest gate.
Agree a work window with the utility operator.
Questions
Frequently asked questions
Can the mower cut steep lagoon and tank banks?
Compare the ME800-48 for maintained banks. Have the site team confirm the slope, work boundary and water setback.
Can it keep reservoir embankments ready for inspection?
Yes. A short, even cut makes seepage and cracks easier to see. The ME1000-48 and ME1200D-48 suit large embankments.
Does it work on wet ground?
Rubber tracks spread the load, but wet banks can lose grip or soften. Inspect the ground first and postpone work if access is unstable.
Does it help with restricted site access?
One operator runs each machine, so fewer contractor staff need site access.
What documents do you provide for utility procurement?
Technical data sheets, CE documents and ISO 9001 certificate. We reply within 24 hours.
Keep reading
Related buying resources
Get a quote for water utility grounds
Send your site measurements and project details. We reply within 24 hours.