Remote Control Mowers for Water Treatment Works and Reservoirs

Keep grass short for inspections on lagoon banks, filter-bed slopes and reservoir embankments. Choose a work route that gives the operator a clear view from firm ground.

  • CE Certified
  • EPA Compliant
  • ISO 9001
  • Exported to 100+ countries
  • Reply within 24 hours
MERI remote mower controlling vegetation on a pond bank
MERI remote mower on a pond bank
100+Countries exported
CECertified
ISO 9001Quality management
24 hReply time

Water utility jobs

Steep, wet banks right next to open water

Mark the work boundary and keep the operator on firm ground.

Embankment inspection needs short, even grass

Plan cuts around inspection access so changes in the bank stay visible.

Controlled contractor access

Check contractor access, site training and escort requirements.

Soft ground around lagoons

Assess surface bearing and postpone work if the ground is unstable.

Model choice

Recommended configurations

Compare mower setups for this site.
AreaModel
Lagoon and tank banksME800-48
Reservoir embankmentsME1000-48 / ME1200D-48
Tight areas around plantME650-T

Field evidence

MERI field example

Tracked mower on a grass bank beside open water
MERI mower on a grassy bank beside water.

Work from a surveyed position

Keep the mower in view and follow the site’s setbacks around open water. Mark soft patches, drains and pipes before mowing. Match the cutting height and operating limits to the selected model.

Plan the first job

Mark the inspection area, access paths and exclusion zones.

Measure bank length, slope and the narrowest gate.

Agree a work window with the utility operator.

Questions

Frequently asked questions

Can the mower cut steep lagoon and tank banks?

Compare the ME800-48 for maintained banks. Have the site team confirm the slope, work boundary and water setback.

Can it keep reservoir embankments ready for inspection?

Yes. A short, even cut makes seepage and cracks easier to see. The ME1000-48 and ME1200D-48 suit large embankments.

Does it work on wet ground?

Rubber tracks spread the load, but wet banks can lose grip or soften. Inspect the ground first and postpone work if access is unstable.

Does it help with restricted site access?

One operator runs each machine, so fewer contractor staff need site access.

What documents do you provide for utility procurement?

Technical data sheets, CE documents and ISO 9001 certificate. We reply within 24 hours.

Keep reading

Related buying resources

Get a quote for water utility grounds

Send your site measurements and project details. We reply within 24 hours.