
Short answer: Before the first cut of the season, treat each stored mower as if it were new to you: check fuel, oil, filters and battery, inspect blades, belts and tracks, test the remote control and stop, then run a short test cut. Do it a few weeks before the season so parts can arrive in time.
Why spring needs its own routine
A machine that went into storage in good order can still come out with problems. Fuel ages, batteries drain, rubber hardens, mice nest in air boxes, and condensation finds its way into connectors. The first warm week of spring is also the week every crew wants every machine at once.
A fixed recommissioning routine, done before the rush, turns unknown faults into a parts list while there is still time to order.
Plan the timing
- Start three to four weeks before the first expected cut.
- Do machines in the order they will be needed: busiest contracts first.
- Order common parts in one go: filters, plugs, belts, flails.
- Book dealer time early for anything beyond your workshop.
Engine and fuel
| Check | What to do |
|---|---|
| Fuel | If stored with fuel, check for stale smell or water; drain and refill if in doubt |
| Engine oil | Change if not done at lay-up; check level on level ground |
| Air filter and box | Replace the element; look for nests and debris |
| Spark plug (gasoline) | Inspect, gap or replace |
| Fuel lines and filter | Look for cracks and hardening; replace the filter |
| Coolant (water-cooled units) | Level and strength |
Follow the engine manual for your engine. The ME1200-48 runs a Loncin 459 gasoline engine; other engines are offered by configuration.

Battery and electrics
Charge the battery fully and check it holds charge overnight. Clean terminals. Unplug and inspect the main connectors for corrosion or moisture, then refit firmly. On 48 V machines with two 1,000 W travel motors, check the motor and controller plugs and any cable runs that rub on the frame.
Cutting system
- Stop the engine and lock out before working on the deck.
- Check every flail or blade; replace worn ones in sets.
- Check rotor bearings for play and grease them.
- Inspect the deck belt for cracks and set tension.
- Clean out any old clippings left in the hood.
Cutting height on MERI flail models adjusts from 30 to 300 mm; set it for the first job, usually higher than mid-season.
Tracks and undercarriage
Check track tension, look for cracks across the lugs and cuts into the cords, and spin each roller. Rubber that sat in one position all winter can take a few runs to settle; recheck tension after the first day.
Remote control and safety test
Charge the transmitter battery and spares. With the cutter off, test every function at low speed. Press the emergency stop and confirm the machine stops. MERI remote mowers have a standard range of 800 m, with an optional R1 transmitter up to 1,000 m, and are designed to stop if the signal is lost; test that the machine stops when the transmitter is switched off.
Test cut and sign-off
Run each machine for 20–30 minutes on a yard bank or easy site before it goes to a contract. Listen for new noises, check for leaks, and confirm the cut is even. Sign off the machine on its record with the date and hours. Only signed-off machines go out on the first week’s jobs.
A sign-off sheet for each machine
| Item | Checked | Notes |
|---|---|---|
| Fuel and oil | ||
| Filters | ||
| Battery and charge | ||
| Blades, belts and bolts | ||
| Tracks and tension | ||
| Remote stop test | ||
| Test cut |
Keep the signed sheet with the machine log.
A signed sheet tells the crew a machine is ready, and it shows the workshop what was found before the season started.
Common mistakes
- Starting recommissioning the week the grass takes off.
- Running last year’s fuel.
- Skipping the stop test.
- Sending machines out without a test cut.
Related MERI pages
- Off-season storage checklist
- Fuel and seasonal storage
- Battery drains overnight
- Spring workload planning
- Flail mower maintenance guide
- ME1200-48 gasoline flail mower
Frequently asked questions
When should spring recommissioning start?
Three to four weeks before the first expected cut, so parts and dealer time can be booked.
Should I use fuel left in the tank over winter?
If it smells stale or shows water, drain it and refill with fresh fuel.
What safety test is needed?
Test all functions at low speed with the cutter off, press the emergency stop, and check the machine stops when the transmitter is switched off.
Why run a test cut?
It shows leaks, noises and cut quality before the machine reaches a client site.
Send us your site details
Tell us the job, area, slope and country. MERI replies within 24 hours.
Need a mower recommendation for your terrain or project?
Get a Quote